Los Altos 1200 sqft 2 Story Art Gallery ADU
1200 sqft 2 story modern adu with a loft and a rooftop deck. We designed this art gallery adu for the client as a meeting space doubled as a guest house.
Santa Clara 1200 sqft ADU
After building this ADU with vaulted high ceiling and a flexible floorplan, owner decided to move into the ADU and rent out the front house. After two years living here, owner is welcoming their newborn here.
Construction timeline: 4 months
Saratoga 1000 sqft ADU
This large 2 bedroom 2 bathroom ADU features a big master bathroom with tub and a walk in closet. Electric panel was upgraded to 400amp.
Construction timeline: 6 months
Mountain View 500 sqft ADU
We designed and built this 1b1b ADU. From design, permit, to completion, it took roughly 1 year. The client is a young family that need the space for their in-laws. Very happy for them😇.
Construction timeline: 4 months
San Jose 400 sqft ADU
A modern pool house for our client in San Jose. This ADU is meant to be a surprise gift for the client's visiting mom. Love it that there's a shower that they can easily access after using the pool now!
Construction timeline: 6 months
Cupertino 749 sqft ADU
This 2 bedroom1 bathroom ADU was built for owner's elderly parents. We helped the owner to design and construct the space. 9 feet vaulted ceiling, big bay window, french door opening to the patio area.
Construction timeline: 4 months
San Jose 950 sqft ADU
Another ADU in San Jose just got completed! Owner is a very experienced investor and owns properties all over the Bay Area. This is one of the investment properties that we worked on for him.
Construction timeline: 6 months
Santa Clara 1050 sqft ADU
Santa Clara finally revised the city's ADU ordinances to allow more than 2 bedrooms and more than 1 bathroom now! This 3 bedroom 2 bathroom ADU is perfect as a cash-generating investment property.
Construction timeline: 4 months
Campbell 475 sqft ADU
This 1 bedroom1 bathroom ADU is now renting for $2980/month; the front house is renting for $4700/month. Many renters are attracted to the private yards that we created - hope the aerial view gives you some inspirations.
Construction timeline: 3 months